Projects

No Project Name Scope of Work Client Period
1 Dredging Work for Bojonegara Port (Ph-1) Banten, Indonesia
Dredging Work for Bojonegara Port (Ph-2) Banten, Indonesia
  • Dredging of soft material
  • Dredging of coral and hard material
PT Pembangunan Perumahan 2004 – 2005
2 Dredging of Navigational Channel for Bengalon Port Development, Lubuk Tutung, East Kalimantan Dredging of navigational channel PT McConnell Dowell Indonesia 2005
3 Dredging At Terminal Basin Phase 3 and 4, Karimun, Indonesia Dredging and chiseling work PT Saipem Indonesia 2009 – 2012
4 Dredging Work for Proposed New Jetty for PT Sarana Citranusa Kabil, Batam Dredging of soft material
Chiseling and dredging of hard material
PT Hutama Karya 2009 – 2010
5 Floating LNG Terminal West Java – Dredging and Gravel Placement Works
  • Dredging work for Floating LNG dolphin foundation
  • Gravel placement for seabed reinforcement of floating LNG dolphin foundation
Golar LNG Energy 2011 – 2012
6 The Urgent Rehabilitation Project of Tanjung Priok Port
  1. Demolition and excavation of existing breakwater
  2. Dredging for inner channel and turning basin 3,000,000 mᶟ
  3. Construction of new dam that involves :
  • Trench excavation
  • Driving of bamboo piles
  • Installation of bamboo mattress
  • Placing and trimming of reuse material
  • Supply stone materials :
    • Stone materials 50-100 kg Grade D 133,000 mᶟ
    • Stone material 100-200 kg Grade C 27,000 mᶟ
    • Stone material 250-500 kg Grade B 24,600 mᶟ
    • Stone material 500-1000 kg Grade A 15,800 mᶟ
  • Placing and trimming of rubble stone grade D
  • Placing stone grade C for foot protection
  • Placing and trimming of armour stone grade B
  • Installation concrete block
  • Installation of coping block
  • Placing and trimming of reuse concrete block
Toyo – Adhi Joint Venture 2012 – 2014
7 North Kalibaru Container Terminal Phase I, Tanjung Priok, Jakarta, Indonesia
  • Dredging trench Jetty 1A 1,200,000 mᶟ
  • Dredging trench Jetty 1B 2,700,000 mᶟ
  • Dredging at sheet pile area 1,700,000 mᶟ
  • Dredging access channel 200,000 mᶟ
  • Dredging existing dam (Dam Tommy and Dam Tengah) 700,000 mᶟ
  • Sheet pile breakwater removal 3200 m
  • Oil receiving jetty removal 500 m
Van Oord Indonesia 2013 – present
8 Surabaya Western Access Channel, Tanjung Perak, Surabaya Dredging and chiseling Van Oord Indonesia 2014 – 2015
9 Dredging of Trench for Pipeline Foundation Dredging and chiseling of a trench for 16” pipeline route Hafar Marine Pte Ltd 2014
10 Pluit City : Dredging and Land Development
  • Sand key dredging 3,000,000 mᶟ (70% dredging works were performed by East Marine Pte Ltd and 30% was done by PT Timur Bahari)
  • Access channel dredging 50,000 mᶟ
  • Chiseling breakwater concrete slab core 1,200 m
  • Removal of existing breakwater 1,200 m
Joint Operation Boskalis Van Oord 2015 -present
11 Central Java 2×1000 MW Power Plant
  1. Dredging Work
  • Dredging at Jetty Area 540,000 mᶟ
  • Dredging at Intake Pipeline Area 500,000 mᶟ
  • Dredging at Outfall Pipeline Area 400,000 mᶟ
  • Chiseling Works
  • Silt Curtain Installation
  1. Pipelaying Work
Mitsui Engineering and Shipbuilding 2016 – present