The Urgent Rehabilitation Project of Tanjung Priok Port

ClientToyo - Adhi Joint Venture
Period2012 - 2014

Scope of Work

  1. Demolition and excavation of existing breakwater
  2. Dredging for inner channel and turning basin 3,000,000 mᶟ
  3. Construction of new dam that involves :
  • Trench excavation
  • Driving of bamboo piles
  • Installation of bamboo mattress
  • Placing and trimming of reuse material
  • Supply stone materials :
    • Stone materials 50-100 kg Grade D 133,000 mᶟ
    • Stone material 100-200 kg Grade C 27,000 mᶟ
    • Stone material 250-500 kg Grade B 24,600 mᶟ
    • Stone material 500-1000 kg Grade A 15,800 mᶟ
  • Placing and trimming of rubble stone grade D
  • Placing stone grade C for foot protection
  • Placing and trimming of armour stone grade B
  • Installation concrete block
  • Installation of coping block
  • Placing and trimming of reuse concrete block